Right-Sizing a Server Refresh: Less Hardware, Same Resilience By Henry Lawrence Client profile: UK manufacturing group with several sites.Service delivered: Server infrastructure and lifecycleProject: About 3 months, from design to decommissioning Read about Case Studies, Pillar: Visibility, Sector: Manufacturing, Capability: Server Infrastructure