Client profile: UK manufacturing group with several sites.
Service delivered: Server infrastructure and lifecycle
Project: About 3 months, from design to decommissioning
A server refresh had been quoted around a large replacement server. The question was whether the site really needed that much.
Hardware quotes tend to be sized for the worst case. Buying more capacity than the workload needs raises the upfront cost and leaves extra equipment to power, patch and eventually replace. The business wanted a refresh that matched what the site actually ran.
We treated the design stage as the place to challenge the quote, then delivered the smaller, better-fitted option end to end.
A refresh is the best moment to ask what the infrastructure is really for. Sizing to the real workload saves money now, simplifies what has to be looked after later, and avoids paying for capacity that never gets used.
If a server refresh is on the horizon, book your free IT review and we will help you size it to what you actually run.